Case Study: Ampere Electric cuts payroll hours and cash-flow leakage with Volca

A Volca Case Study

Preview of the Ampere Electric Case Study

Ampere Electric saves 60+ hours a week with Volca

Ampere Electric, a third-generation family electrical company based in Las Vegas, faced significant challenges with its manual payroll process. The system, which relied on self-reported hours and commissions, consumed over 60 hours of labor each week and led to cash-flow leakage as errors were often discovered only after payouts were made. To solve this, they partnered with Volca to implement a ServiceTitan-connected pay program.

Volca designed a solution that moved away from self-reported inputs by connecting payroll calculations directly to the operational data within ServiceTitan. This eliminated the manual compilation and closed the cash-flow leakage. The result was a trusted payroll system that freed up dozens of labor hours weekly and provided clarity and confidence for both leadership and employees, ending the need for constant auditing.


View this case study…

Volca

1 Case Studies