Case Study: Leading Metal Manufacturing Company achieves streamlined scheduling and reduced maintenance costs with Viziya WorkAlign Scheduler

A Viziya Case Study

Preview of the Leading Metal Manufacturing Company Case Study

Metals Manufacturer Upgrades Work Planning and Scheduling

Metals Manufacturer faced a major scheduling and planning gap after a corporate-wide Oracle EAM/ERP rollout left planners unable to make bulk updates or efficiently manage ~220,000 assets and roughly 300,000 annual work orders across twelve sites. The loss of mass-edit and calendar flexibility created heavy manual workarounds and inefficiencies, so the company turned to VIZIYA and its WorkAlign Scheduler to address the problem.

VIZIYA implemented WorkAlign Scheduler as a web-based, tightly integrated bolt-on to Oracle eAM, allowing planners to view live work order backlogs, perform mass edits, reschedule large chunks of work, and automatically recalculate durations and calendars. The VIZIYA solution improved planning and scheduling speed, increased resource utilization, reduced reliance on overtime and contractors, and produced a marked decline in average maintenance man-hours per unit of production, prompting rollout across the entire business unit.


Open case study document...

Viziya

10 Case Studies