Vision Solutions
183 Case Studies
A Vision Solutions Case Study
Hatch Australia, a global engineering consultancy with 8,700 employees managing projects worth over $35 billion, faced a critical risk: several Windows-based, business‑critical applications (MS SQL, Exchange, Oracle and file/print services) ran across distributed sites, and an outage could cost the company hundreds of thousands of dollars per day and damage client confidence. Improving system resiliency and business continuity was therefore a top priority.
Hatch deployed Vision Solutions’ Double‑Take Availability with implementation partner Business Continuity Asia Pacific, leveraging bandwidth throttling/compression and Riverbed WAN accelerators to support remote sites with limited connectivity. The solution is now used globally, with DR/HA infrastructure tested and documented and key technicians trained and certified, restoring continuity, minimizing downtime and earning a 9/10 satisfaction rating.