Case Study: ECLAT Textile achieves 10-minute failover and uninterrupted operations with Vision Solutions' Double-Take Availability

A Vision Solutions Case Study

Preview of the ECLAT Textile Case Study

ECLAT Textile - Customer Case Study

ECLAT Textile, a Taipei-based multinational and major ODM for global apparel brands, faced repeated data-centre outages caused by HVAC and maintenance issues that threatened continuous operation of order processing, email and production systems. The company needed a remote disaster-recovery solution that could replicate VMware-hosted databases and mail systems to a secondary Miaoli data centre without requiring identical hardware or complex, costly maintenance.

ECLAT implemented Double-Take Availability to capture byte-level changes and asynchronously replicate systems to Miaoli over an upgraded 100M optical link, supporting mixed physical and virtual environments and one-to-one or many-to-one replication. The result: manual failover to the secondary site within 10 minutes, real-time data integrity, high availability without duplicating infrastructure, simplified administration and lower cost, with plans to extend protection to more critical systems.


Open case study document...

Vision Solutions

183 Case Studies