A Victaulic Case Study
Scottish Water, along with contractor Morrison Construction, faced several challenges while replacing large-diameter sewage pipelines on the Kirkland Methil Bridge. These challenges included a tight installation schedule, the need to accommodate differential settlement, and strict requirements for managing joint end load and shear on the bridge spans, all while minimizing disruption to traffic. Victaulic recommended its Advanced Groove System (AGS) Vic-Rings and flexible couplings for the project.
The Victaulic AGS solution provided a fast, flame-free installation that was 50% quicker than traditional welding, significantly compressing the construction schedule and minimizing traffic impact. The system delivered the required reliability and strength for the bridge spans while accommodating movement from settlement. By choosing Victaulic, the contractor also eliminated the need for post-weld coating, lining, and non-destructive testing, ensuring a smooth inner flow path to maximize the lifespan of the piping system.