Case Study: Osisko Mining Corporation achieves faster, safer mine installation with Victaulic system solutions

A Victaulic Case Study

Osisko Mining Corporation streamlines 54-inch mine piping with Victaulic for safer, faster installation

Osisko Mining Corporation faced the challenge of constructing its large-scale Canadian Malartic gold mine on a demanding schedule. A major component of this project involved reliably joining large diameter pipe systems up to 54 inches for process water, chemicals, and slurry applications. Osisko partnered with Victaulic and selected its Advanced Groove System (AGS) to meet these requirements for strength and ease of installation.

The Victaulic AGS solution provided streamlined and easy installation while allowing for visual inspection of proper joint assembly. By implementing Victaulic systems, Osisko maximized on-site installation schedules and mitigated risk, which enabled the company to meet its construction timeline. The use of Victaulic solutions also increased on-site safety throughout the installation process.


View this case study…

Victaulic

66 Case Studies