Case Study: South Warwickshire University NHS Foundation Trust cuts installation time by 80% with Victaulic pipe joining solutions

A Victaulic Case Study

NHS cuts pipework installation time by 80% with Victaulic

Warwick Hospital, operated by South Warwickshire University NHS Foundation Trust, required a major £14 million energy infrastructure overhaul while remaining fully operational. The challenge involved installing nearly two kilometers of heating mains with strict safety requirements and a compressed schedule within the sensitive healthcare environment. To meet this, contractor FP Hurley & Sons utilized Victaulic's flame-free pipe joining system, specifically the StrengThin™ 100 system for stainless steel pipe.

Victaulic's grooved mechanical solutions enabled rapid, safe installation without hot work, allowing for significant pre-assembly and cutting pipework installation time by 80%. This kept the critical project ahead of schedule and minimized disruption. The successful upgrade, featuring heat pumps and new heating distribution, enhances the hospital's sustainability and future-proofs its operations, all while maintaining the highest safety standards.


View this case study…
NHS logo

NHS


Victaulic

66 Case Studies