Legendre completes Victaulic pipe installation in 3 months, over 2x faster than cut-and-weld

Groupe Legendre, the owner of the Nova Aragon office building project in Paris, faced a tight 12-month construction schedule that relied heavily on prefabrication. To meet this aggressive timeline for the HVAC installation, the project's engineering contractor turned to Victaulic for its grooved pipe joining technology and prefabrication capabilities.

Victaulic implemented a comprehensive solution that included design, fabrication, and delivery services. Their Virtual Design and Construction team used Revit and BIM modeling to design the piping system, which was then prefabricated off-site. This approach resulted in the entire pipe installation being completed in just three months, a rate more than twice as fast as a traditional cut-and-weld method, successfully keeping the overall project on schedule.


View this case study…

Victaulic

66 Case Studies