Hines speeds Texas Tower HVAC delivery to 2–3 days with Victaulic

Hines faced the challenge of constructing the HVAC system for its 47-story Texas Tower high-rise in a confined downtown location with a compressed schedule and pressure requirements up to 300 psi. The contractor, Way Engineering, turned to Victaulic as a project partner for its engineering and installation solutions, including the Vic-300 MasterSeal butterfly valves.

Victaulic provided upfront collaboration, coordinated just-in-time deliveries to reduce lead times, and offered products that simplified installation and met the high-pressure demands. This partnership helped the project overcome logistical obstacles and COVID-19 restrictions, resulting in significant time savings and successful timely execution.