A Victaulic Case Study
Green Mountain needed to install a reliable cooling system for its unique data center within a converted mountain facility in Stavanger, Norway. The primary challenges were a compressed construction schedule and the difficulties of installing and maintaining a system within a confined underfloor space. Green Mountain and its contractor, Sig Halvorsen, turned to Victaulic for a solution using its grooved couplings, fittings, and valves.
Victaulic's grooved mechanical piping system provided an easy-to-install, weld-free solution that accelerated installation and allowed visual confirmation of proper assembly. This gave Green Mountain the flexibility to build their cooling infrastructure in phases as the business expanded, avoiding costly pre-build assumptions. The solution also aligned with their sustainability goals, as it eliminated welding fumes and utilized products made from recycled materials. Victaulic's technology helped overcome spatial, schedule, safety, and environmental concerns, resulting in a scalable, world-renowned data center powered by renewable energy.