Case Study: Fort McMurray #468 First Nation achieves faster pump station installation with Victaulic

A Victaulic Case Study

Fort McMurray #468 First Nation installs 50+ prefabricated spools in 3 days with Victaulic

Fort McMurray #468 First Nation needed to build a new pump station to provide clean drinking water and sewage services for its residents. To meet this critical infrastructure need, they partnered with Victaulic for a complete piping solution that included fabrication and virtual design services to overcome a compressed construction schedule.

Victaulic designed and prefabricated the stainless steel piping system off-site, which enabled the mechanical subcontractor to install the majority of the piping in just three days with a small crew. This approach significantly minimized the overall project timeline and made up for earlier delays. The Victaulic system was also praised for its ease of future maintenance and its visually pleasing result, providing the community with a long-lasting solution.