Case Study: Danderyd Hospital achieves faster, safer hospital expansion with Victaulic

A Victaulic Case Study

Danderyd Hospital completes expansion with 70% offsite assembly using Victaulic

Danderyd Hospital faced the challenge of expanding and installing a new mechanical room while meeting tight deadlines, stringent hygiene requirements, and ensuring a safe environment for its ongoing operations. The contractor, Sandbäckens Rör, determined that traditional pipe joining methods were insufficient and instead partnered with vendor Victaulic to utilize their grooved couplings and fittings.

Victaulic provided a comprehensive solution that included project planning, converting initial plans into a detailed 3D model, and fabricating approximately 70% of the pipe spools offsite. This approach ensured cost and schedule certainty, minimized on-site disruption, and improved safety by eliminating the need for hot works. The result was a financially beneficial project for the contractor that proceeded according to plan, leading them to state they would use Victaulic's mechanical pipe joining system again.


View this case study…

Victaulic

66 Case Studies