Case Study: Sweetwater Sound achieves on-time warehouse expansion with Victaulic solutions

A Victaulic Case Study

Current Mechanical completes Sweetwater Sound warehouse in 9 months with Victaulic

The customer, Current Mechanical, faced the challenge of installing a complex mechanical system for a new warehouse under a compressed nine-month schedule with a limited crew. To expedite and simplify the installation, they partnered with vendor Victaulic, utilizing their Virtual Design and Construction (VDC) services for drawing and fabrication scheduling.

Victaulic provided a comprehensive solution, including 3D modeling to identify potential issues early, on-site support, and pre-allocated materials. The use of specific Victaulic products like single-coil AHU drops and the QuickVic™ SD Installation-Ready™ System significantly sped up installation. This approach gave Current Mechanical the design flexibility and installation efficiency needed to successfully complete the project on time for Sweetwater Sound's new warehouse.


View this case study…

Victaulic

66 Case Studies