The customer, Current Mechanical, faced the challenge of installing a complex mechanical system for a new warehouse under a compressed nine-month schedule with a limited crew. To expedite and simplify the installation, they partnered with vendor Victaulic, utilizing their Virtual Design and Construction (VDC) services for drawing and fabrication scheduling.
Victaulic provided a comprehensive solution, including 3D modeling to identify potential issues early, on-site support, and pre-allocated materials. The use of specific Victaulic products like single-coil AHU drops and the QuickVic™ SD Installation-Ready™ System significantly sped up installation. This approach gave Current Mechanical the design flexibility and installation efficiency needed to successfully complete the project on time for Sweetwater Sound's new warehouse.