Victaulic
66 Case Studies
A Victaulic Case Study
The City of Longmont required a solution for their wastewater treatment plant's aeration piping system that could accommodate thermal expansion and contraction. Victaulic provided its grooved coupling solutions, including the Style 177N QuickVic™ Flexible Couplings, to address this challenge.
Victaulic's solution eliminated the need for bellows and dangerous, time-consuming welding processes. The contractor, PCL Construction, significantly reduced its construction schedule and manpower requirements, joining a 60-foot header pipe section in less than one hour. Victaulic's products improved safety and eased installation for the project.