A Victaulic Case Study
The customer, ČEZ Energetické Služby, was contracted to install an industrial cooling system for a new automotive component plant in the Czech Republic under a very tight schedule. The contractor knew traditional pipe joining methods like welding were too time-consuming and partnered with Victaulic to utilize their grooved piping solutions to meet the challenge.
Victaulic provided grooved couplings, valves, and fittings for the project, supported by BIM and 3D modeling coordination to improve planning and collaboration. They also recommended prefabricating components off-site to speed up installation and avoid weather delays. The Victaulic solution resulted in a fast and reliable installation, with the system being future-ready for easy expansion or maintenance, ultimately reducing downtime and associated costs.