Associated Electric Cooperative Inc. achieves 50% labor savings with Victaulic

Associated Electric Cooperative Inc. faced sporadic leaks in the potable water system at its New Madrid Power Plant, compromising critical system integrity. The owner, along with contractor Enerfab, sought a reliable upgrade solution and partnered with Victaulic to join the galvanized carbon steel piping.

Victaulic provided pipe joining solutions, including QuickVic and Style 99 couplings, and supported the project with prefabrication and VDC services. This value-engineered approach streamlined installation, expediting the pipe joining process. By implementing Victaulic's solutions, the project achieved a 50% labor savings compared to traditional socket-welded methods, enhancing system reliability.