Case Study: Ardmore streamlines Old War Office HVAC retrofit with Victaulic pipe joining solutions

A Victaulic Case Study

Ardmore speeds OWO HVAC installation and finishes mechanical areas ahead of schedule with Victaulic

The customer, Ardmore, faced significant challenges during the luxury retrofit of London's historic Old War Office. Without adequate blueprints for the existing infrastructure and with much of the work to be done in confined spaces, their team needed a pipe joining solution that was easier and safer to install than welding. They turned to vendor Victaulic for a grooved mechanical piping system to accommodate these constraints and prevent potential delays.

Victaulic provided grooved piping components and modular Vibration Isolation Pump Drops for the HVAC system. Their solutions enabled easier installation in tight spaces, improved onsite safety by eliminating hot work, and allowed for field adjustments. This helped the contractor finish the mechanical areas well in advance of the deadline. Victaulic's support and products increased productivity and lowered execution time and labor costs for the project.


View this case study…

Victaulic

66 Case Studies