Vertiv
131 Case Studies
A Vertiv Case Study
Leading South Florida-Based Healthcare Company, a large public healthcare system that recently added a three-story, 75,000 sq. ft. bed-tower expansion with 96 patient rooms and new imaging suites, needed reliable, space-efficient cooling to protect revenue-generating imaging equipment and critical IT networks while controlling costs and maintaining patient and staff comfort. Vertiv, the hospital’s long-time IT infrastructure partner, was chosen to supply precision cooling solutions, including Liebert DataMate precision environmental cooling systems, to meet strict uptime, space, and efficiency requirements.
Vertiv installed Liebert DataMate units in imaging suites and network closets, specified a 3‑ton chilled water unit for closet cooling, trained hospital staff on operation and maintenance, and provided an extended warranty. The Vertiv solution increased protection and availability of critical imaging and IT equipment, reduced overcooling and improved energy efficiency by as much as 20%, helped extend UPS battery life, and improved patient and provider comfort and satisfaction while simplifying long-term maintenance.
Leading South Florida-Based Healthcare Company