Case Study: Involta achieves greater energy efficiency and reliable cooling with Vertiv's Liebert DSE optimization

A Vertiv Case Study

Preview of the Involta Case Study

Involta - Customer Case Study

Involta, a national colocation and IT services provider with 14 data centers including sites in Akron, Independence and Pittsburgh, was facing higher rack densities and more concentrated heat loads as customers consolidated equipment. To maintain availability, security and energy efficiency while scaling operations, Involta partnered with Vertiv and deployed the Liebert DSE free‑cooling economization system with the Optimization (Liebert iCOM) control upgrade.

Vertiv’s solution optimized condenser fans, compressors and refrigerant pumps and smoothed transitions between mechanical and free cooling, allowing Involta to extend economization hours, reduce power consumption and realize measurable cost savings. The Liebert DSE Optimization delivered more precise cooling, improved efficiency, a faster return on investment and helped Involta consistently meet SLAs—strengthening operational reliability and the company’s reputation.


Open case study document...

Vertiv

131 Case Studies