Vertiv
131 Case Studies
A Vertiv Case Study
Cinia Group Ltd., Finland’s leading network operator, commissioned the C‑LION submarine fiber cable — a 1,172 km route linking Helsinki and Rostock that provides a 144 Tbit/s connection to Europe. Cinia needed single integrated power and cooling modules with dual diesel generators at each cable landing, deployed quickly and built to withstand a corrosive marine environment while meeting exacting site and local standards; they selected Vertiv as their partner based on prior rapid deployment experience.
Vertiv delivered two turnkey cable landing stations equipped with NetSure™ 701 DC power systems (expandable), Liebert® HPS cooling, AC distribution, inverters, four‑hour battery backup, generators, and access control/fire systems. Vertiv completed simultaneous deployments in Germany and Finland within three months, met local regulatory and infrastructure requirements, and provided corrosion‑resistant, customized installations—enabling Cinia’s C‑LION system to go live on schedule and secure high‑capacity connectivity to the rest of Europe.