Turner demobilizes a tower crane early with Versatile on a 17-story, 378,000 sq. ft. project

Versatile worked with Turner on a major construction project in San Diego. The challenge was to optimize crane operations and improve the overall planning and sequencing of construction activities on the jobsite.

The Versatile solution, which utilizes AI and IoT technology, provided critical insights into crane utilization and material flow. This empowered the team to better plan activities, resulting in more efficient crane operation, a positive impact on the schedule and safety, and the early demobilization of a tower crane. According to the project superintendent, Versatile helped avoid overtime and reduce peaks and valleys in crane usage.