Verbrec
2 Case Studies
A Verbrec Case Study
Verbrec was engaged by Eraring Power Station, which faced the challenge of preparing its new 460 MW battery energy storage system (BESS) for a safe and efficient operational launch. The project required establishing a robust foundation for asset management and maintenance planning to ensure long-term grid stability and performance from the outset.
Verbrec implemented a comprehensive asset and maintenance management framework within the SAP system, covering over 50,000 individual assets. Their solution encompassed asset data collection, maintenance program development, and system implementation, which positioned the facility for safer commissioning and more reliable long-term performance. Verbrec's work provided the critical operational readiness needed for this large-scale battery to support the stability of the National Electricity Market.