Case Study: Mark Anthony Brewing solves inbound load scheduling and receiving delays with Velostics

A Velostics Case Study

Preview of the Mark Anthony Brewing Case Study

Mark Anthony Brewing reduces inbound load scheduling and receiving delays with Velostics

The customer, Mark Anthony Brewing, the fourth-largest brewer, faced significant challenges with inbound load scheduling and receiving delays. These operational inefficiencies impacted material availability and driver wait times. To address this, they partnered with the vendor Velostics and its innovative scheduling technology.

Velostics implemented a solution that combined process change with its technology, which is referred to as a 3-way scheduling solution. This allowed Mark Anthony Brewing's schedulers to focus on guaranteeing material availability and balancing loads throughout the day. The results included minimized driver wait times, real-time confirmation for planners, and controlled detention charges. Velostics successfully revolutionized the brewer's operational efficiency.


View this case study…

Velostics

26 Case Studies