Velosi Asset Integrity Limited
83 Case Studies
A Velosi Asset Integrity Limited Case Study
The customer, TR Abu Dhabi, needed to install technology to recover valuable gases from refinery off gases at its Ruwais Refinery. Velosi Asset Integrity Limited was assigned to provide Front End Engineering & Design (FEED) services for this project.
Velosi implemented a strict methodology, performing a Corrosion Risk Assessment Study (CRAS) to evaluate potential risks and verify material selections. The solution successfully delivered corrosion loop drawings, a CRAS register, and a final report. Velosi's team of experts successfully performed all activities within the assigned scope of work.