Case Study: Technip Energies reduces AIV/FIV risk in the Nasr 100MBD Project with Velosi Asset Integrity Limited

A Velosi Asset Integrity Limited Case Study

Preview of the Technip Energies Case Study

Technip Energies completes AIV/FIV studies ahead of schedule with Velosi

Velosi Asset Integrity Limited was appointed by Technop Energies to address a challenge for the Nasr 100MBD Project Phase 2 for ADNOC Offshore. The challenge was to assess the piping system for potential failure points related to Acoustic Induced Vibration (AIV) and Flow Induced Vibration (FIV), which posed a significant risk of fatigue failure.

The solution implemented by Velosi involved a comprehensive study strictly following the Energy Institute Guidelines. Their process included identifying excitation sources, calculating failure likelihood scores, and recommending specific mitigation measures. Velosi successfully delivered detailed AIV and FIV study reports ahead of schedule, surpassing client expectations with high-quality outcomes that added significant value to the client’s objectives.


View this case study…