Case Study: Shell LNG Canada achieves successful RBI implementation with Velosi Asset Integrity Limited

A Velosi Asset Integrity Limited Case Study

Preview of the Shell LNG Canada (lngc) Case Study

Shell LNG Canada (lngc) completes RBI study for 2 LNG facilities with Velosi Asset Integrity Limited

Velosi Asset Integrity Limited was appointed by Shell LNG Canada (LNGC) to execute a comprehensive Risk Based Inspection (RBI) study for their new LNG facility in Canada. The challenge was to implement an RBI program across numerous complex units, including liquefaction, storage, and various utility systems, to ensure asset integrity and safe operations.

Utilizing the Shell Risk Based Inspection (s-RBI) methodology, Velosi successfully conducted the study, delivering a complete suite of outputs including an s-RBI report, corrosion control documents, and inspection plans. The project was completed successfully, exceeding client expectations and culminating in high-quality deliverables that aligned with the client’s vision. This outcome reflects Velosi's commitment to excellence and their ability to navigate project complexities.


View this case study…

Velosi Asset Integrity Limited

83 Case Studies