A Velosi Asset Integrity Limited Case Study
QatarEnergy engaged Velosi Asset Integrity Limited to conduct a Risk-Based Inspection (RBI) study for its Linear Alkyl Benzene chemical plant. The challenge was to optimize inspection scopes and intervals to reduce costs while focusing efforts on the most critical equipment and piping systems that could impact plant operations.
Velosi implemented a comprehensive RBI solution using the APMS Mechanical Integrity module. The project was completed successfully, exceeding client expectations by delivering high-quality results that aligned with QatarEnergy's vision. Velosi's work ensured a focus on asset reliability and client satisfaction, ultimately reducing inspection costs and improving the targeting of critical systems.