Case Study: Kent achieves flare minimization in Upper Zakum with Velosi Asset Integrity Limited FEED services

A Velosi Asset Integrity Limited Case Study

Preview of the Kent Case Study

Kent completes FEED services for flare minimization with Velosi in 1 project

The customer, Kent, required FEED services to address flare minimization in the Upper Zakum field, specifically needing to identify suitable construction materials for a new Flare Gas Recovery System and verify materials for an existing Production Separator. Velosi Asset Integrity Limited was assigned to perform this service.

Velosi implemented a strict methodology to deliver a comprehensive Material Selection Report. Their solution included developing a Material Selection Philosophy, a Corrosion Assessment, and recommending Material Selection and Corrosion Control Measures. Velosi successfully completed all activities within the project's scope, providing Kent with the essential deliverables needed to inform the next stages of the flare minimization project.


View this case study…

Velosi Asset Integrity Limited

83 Case Studies