Basic Engineering Study for Fire Risk Assessment Implementation (Phase-1)

A Velosi Asset Integrity Limited Case Study

Case study about Abu Dhabi Oil Company Limited working with Velosi Asset Integrity Limited.

View this case study…

Velosi Asset Integrity Limited

47 Case Studies