Case Study: DePuy Synthes achieves cost and time savings in contractor management with VelocityEHS Control of Work

A VelocityEHS Case Study

Preview of the DePuy Synthes Case Study

How DePuy Synthes Saved Costs and Increased Efficiency in Their Contractor Management Process

DePuy Synthes, part of Johnson & Johnson’s Medical Devices group, faced inefficient, paper-based contractor and permit-to-work processes at its Cork, Ireland facility. The manual system created bottlenecks with hourly contractors waiting for approvals, made audits difficult, and offered limited visibility into contractor qualifications, insurance, and ongoing permit work. Technical Services Leader Dan Donovan wanted a flexible, easy-to-use electronic solution that met corporate compliance requirements.

VelocityEHS implemented its Control of Work solution in about two and a half months, recreating DePuy’s permits electronically and building a centralized contractor database while engaging end-users and providing training. The system reduced permit preparation time and contractor wait times, ensured contractors were properly qualified and insured, improved 360-degree visibility and reporting for management, delivered measurable cost and time efficiencies, and earned praise from the British Standards Institute.


Open case study document...

DePuy Synthes

Dan Donovan

Technical Services Leader


VelocityEHS

80 Case Studies