A VelocityEHS Case Study
Nemo Link is a multinational undersea high-voltage cable project linking the UK and Belgium to boost energy security and renewable integration. Safety manager Craig Silcock faced a complex EHS challenge: multiple jurisdictions, a large international supply chain, varied national EHS practices and languages, and the need for a simple, easy-to-adopt system that didn’t require extensive on-site training.
VelocityEHS delivered an intuitive, scalable platform with quick rollout, strong support and multilingual capability, centralizing incident reporting and automated notifications. The result was smooth adoption across contractors, measurable time savings (fewer spreadsheets and calls), improved incident investigation and risk visibility, and greater confidence in keeping the project on schedule and budget.
Craig Silcock
Safety Health Environment Security and Quality Manager