Case Study: Imperial Oil achieves $2.5M+ in savings with VEERUM

A VEERUM Case Study

Preview of the Imperial Oil Case Study

Imperial Oil saves $2.5M+ with VEERUM

Imperial Oil faced significant challenges due to siloed and hard-to-access data, which led to high costs, low productivity, and the risk of flawed decisions. The company sought a solution to unify its critical engineering, operational, and business information to gain a comprehensive view of its operations. They turned to VEERUM to address these issues with its visual operations platform.

By implementing VEERUM, Imperial Oil integrated its disparate data into a single, interactive 3D model. This solution enabled teams to virtually walk through sites, identify potential issues like engineering clashes before they occurred, and streamline planning and procurement. The results were substantial, with VEERUM helping Imperial Oil achieve over $2.5 million in savings, including a 10x-40x return on investment during the pilot phase, and significantly improving field productivity and safety.


View this case study…

VEERUM

3 Case Studies