EBL (Genossenschaft Elektra Baselland), a Swiss energy supplier, required a custom solution for feeding and processing waste wood and wood chippings for its biomass power plant in Pratteln. Their challenges included minimal space availability and the need for a large fuel storage volume. Vecoplan addressed this by designing and supplying a bespoke reception and processing solution.
Vecoplan implemented a complete system from material reception through to the furnace, employing a range of specialized equipment including conveyors, a disc screen, and a push rod discharger. This solution achieved optimal use of space and a large storage volume. The project was completed on a tight schedule, with assembly from March to August 2015 and controlled furnace operation commencing that December, ensuring reliable and secure plant performance for the customer.
Markus Vögele
Thermal Energy Project Manager