Vecoplan
26 Case Studies
A Vecoplan Case Study
Vecoplan designed and installed a state-of-the-art RDF (Refuse Derived Fuel) processing line for Helmut Westarp GmbH & Co. KG at their Aschaffenburg facility. The customer's challenge was to reliably achieve high performance and high-quality output from various industrial wastes, allowing them to market different RDF qualities, all while installing the new system within an existing operational hall.
The solution implemented by Vecoplan featured a high-performance system with advanced shredders, including the VVZ 250 pre-shredder and the VEZ 2500 re-shredder. This technology enabled the production of different high-quality fuel fractions, reliable separation of materials, and high system availability. Vecoplan delivered a performance-optimized plant that is energy-efficient, achieving energy savings of 20-30%, and is designed for easy maintenance and maximum throughput.