FBSerwis, a Polish waste management company, required a reliable shredding solution to increase throughput and RDF fuel production at its municipal waste treatment plant. The challenge involved integrating a new pre-shredder into an existing RDF line to process large volumes of waste without causing significant downtime.
Vecoplan installed a VEZ 2500 T pre-shredder into the facility with minimal changes to the existing line. The solution from Vecoplan successfully increased the overall throughput of the waste treatment process, enabling the customer to produce more high-quality, homogeneous RDF fuel.