WEIG, a major European supplier of cartonboard and plasterboard liner, needed to replace an aging waste boiler to reduce natural gas consumption, lower CO2 emissions, and cut waste disposal costs. They sought a highly reliable and efficient solution and selected Valmet to provide a new BFB boiler.

Valmet delivered a complete turnkey boiler plant utilizing bubbling fluidized bed technology, designed to run on a mix of paper sludge and rejects. This Valmet solution saves the customer approximately 150 GWh of natural gas annually. A long-term service agreement ensures optimal operation and maintenance, helping WEIG avoid unplanned shutdowns and continue production efficiently.