Södra Cell Mörrum, a pulp mill in Sweden, needed to proactively address wear on a critical component in its recovery boiler to ensure long-term reliability and avoid unplanned downtime. The mill partnered with its long-term service provider, Valmet, for a planned furnace floor section replacement during its annual shutdown.
Valmet delivered and installed six new furnace floor panels, incorporating an upgrade to Sanicro® 38 material in key areas for enhanced corrosion resistance. The project was completed smoothly within the scheduled shutdown window, ensuring minimal operational impact. This proactive solution by Valmet provided the mill with improved durability in a demanding part of the boiler, supporting stable operation and extending the asset's lifetime.