SCA Obbola achieves zero lost time incidents with Valmet's 220-tonne fossil-free lime kiln system

The customer, SCA Obbola, required a new fossil-free lime kiln system for its operations. Valmet delivered this solution, which included a full Wood Powder Firing System and related components to replace two old oil-fueled kilns.

Valmet executed the project with a major focus on health and safety, achieving zero lost time incidents for all employees and contractors on site. This excellent result was accomplished through thorough planning, daily safety procedures, and seamless cooperation. The delivered lime kiln system has a daily capacity of 220 tonnes and makes the customer's operation 100 percent fossil free.