FINSA saves at least 1.5 tons of fresh steam per hour with Valmet

FINSA, a manufacturer of MDF panels, sought to improve the environmental performance and energy efficiency of their production line at their Ourense mill. To meet this challenge, they partnered with Valmet to equip their existing defibrator system with a Valmet Steam Separator C.

Valmet implemented its Steam Separator C, a cost-efficient solution that recovers steam from the defibrator's blow line for reuse. This installation led to significant results for FINSA, including measured savings of at least 1.5 tons of fresh steam per hour, reduced energy costs, and lower CO2 emissions. Valmet's solution provided a short payback time and required little maintenance.