Case Study: Eneco achieves higher plant reliability and efficiency with Valmet biomass-to-energy solutions

A Valmet Case Study

Preview of the Eneco Case Study

Eneco boosts biomass plant reliability with Valmet, cutting 250,000 tonnes of CO2 annually

Eneco, a leading Dutch utility company, faced challenges with insufficient fuel quality and unreliable operation at its Bio Golden Raand biomass plant, which was fueled by recycled wood chips. The poor fuel quality, particularly high chlorine content, caused significant wear and tear on boiler parts. Valmet provided its technology, including a CFB boiler and automation system, and partnered with Eneco to address these issues.

Valmet implemented a comprehensive solution including annual equipment inspections, process and operation support, and a 24/7 on-call service. Through a service agreement, Valmet carried out all boiler maintenance and used analytical tools to monitor fuel quality and optimize the process. As a result, Valmet helped Eneco achieve optimized plant reliability and availability, with overall plant efficiency higher than anticipated. The plant now produces sustainable electricity for 120,000 households and reduces CO2 emissions by approximately 250,000 tonnes annually.


View this case study…