Case Study: Alholmens Kraft boosts boiler plant availability and flexibility with Valmet DNA

A Valmet Case Study

Preview of the Alholmens Kraft Case Study

Alholmens Kraft modernizes AK1 with Valmet DNA in 2024

Alholmens Kraft, a power plant operator in Finland, faced challenges with an outdated and underperforming control system at its AK1 boiler unit. This system lacked modern troubleshooting tools and was difficult to maintain, creating operational inefficiencies. To address this, the customer chose Valmet to implement a retrofit solution using the Valmet DNA Distributed Control System (DCS).

Valmet replaced the old system with its modern Valmet DNA automation, which was commissioned during a tight shutdown window. The solution provided significant results, including boosted plant availability, efficiency, and troubleshooting capabilities. The new system also improved boiler flexibility for the electricity market and streamlined maintenance with easier software updates and readily available spare parts. The customer reported that the project was completed smoothly and expressed high satisfaction with Valmet's expertise.


View this case study…

Valmet

239 Case Studies