Case Study: CA Oil and Gas Co saves $100K with Valin's failsafe electric actuation solution

A Valin Corporation Case Study

Preview of the CA Oil and Gas Co Case Study

CA Oil and Gas Co saves $100K and cuts lead time by 4-6 weeks with Valin Corporation

Valin Corporation was approached by CA Oil and Gas Co to provide a compact, failsafe electric actuation solution for high torque ball valves in a severe outdoor application where air was unavailable and temperature extremes were a concern.

The solution implemented by Valin consisted of a Valvcon electric actuator with battery backup and a Dynatorque torque increaser. This combination provided the necessary torque and failsafe operation at a significantly lower cost and with a faster lead time than standard offerings. Valin saved the customer approximately $100,000 and reduced the project schedule by 4-6 weeks.


View this case study…

Valin Corporation

104 Case Studies