Case Study: a large refinery in California achieves faster, certified valve turnaround with Valin Corporation and Emerson Redundant Control System

A Valin Corporation Case Study

Preview of the Large Refinery in California Case Study

a large refinery in California ships Class 1 Div. 2 RCS panels faster with Valin

A large refinery in California was conducting a turnaround and needed new emergency safety shut off valves for its regeneration process. The refinery and its engineering firm faced a challenge in sourcing a valve package that required a redundant control system with specific, time-consuming third-party certifications due to stringent local safety rules. They contacted Valin Corporation for assistance.

Valin implemented a one-stop-shop solution that included process valves and Emerson's Redundant Control System (RCS). Valin's team secured a Limited Product Certification plan to efficiently provide the necessary Class 1 Div. 2 ratings, saving significant time and avoiding costly field certifications. This allowed Valin to deliver the certified solution in a timely manner and at a competitive price, helping the customer overcome past issues with other vendors.


View this case study…

Valin Corporation

98 Case Studies