Case Study: Uelzena reduces inventory and improves S&OP planning with valantic

A Valantic Case Study

Preview of the Uelzena Case Study

Uelzena saves six-figure costs with Valantic's S&OP optimization

Uelzena, a leading German milk processing company, faced a challenge in its supply chain management due to inefficient coordination between its procurement, production, and sales departments. Without a standardized process or IT support, the company sought to improve its cross-divisional planning. They partnered with vendor valantic to implement a structured Sales & Operations Planning (S&OP) process and a specialized software solution.

valantic introduced a comprehensive S&OP process that improved forecasting, reduced inventory levels, and optimized production planning. This was supported by the implementation of industry-specific software. The project realized savings in the six-figure range for Uelzena, significantly increased planning reliability, and reduced stock levels while better utilizing production capacity.


View this case study…

Valantic

251 Case Studies