Case Study: Schlumberger achieves supply chain efficiency and significant cost savings with valantic

A Valantic Case Study

Preview of the Schlumberger Case Study

Schlumberger cuts supply chain costs and unlocks high six-figure savings with Valantic

Schlumberger, an internationally active producer and distributor of wine, sake, and spirits, faced challenges due to its decentralized operations across several countries. The lack of clear responsibilities, coordination, and a heterogeneous IT landscape led to significant inefficiencies in its supply chain. valantic was engaged to address these issues and support the establishment of a group-wide Sales & Operations Planning (S&OP) process.

valantic implemented a centrally managed S&OP process, standardized reporting, optimized batch size planning, and a consistent contribution margin scheme. This solution provided group-wide transparency, improved planning quality, and optimized inventory management. As a result, Schlumberger achieved efficiency gains and identified cost savings in the high six-figure range, significantly reducing warehouse and logistics costs.


View this case study…

Valantic

251 Case Studies