Case Study: PM International achieves double-digit million euro supply chain savings with valantic

A Valantic Case Study

Preview of the PM International Case Study

PM International identifies double-digit million euro supply chain savings with Valantic

PM International, a manufacturer of nutritional supplements and cosmetics, faced significant capacity bottlenecks and high transportation costs within its rapidly growing supply chain across more than 40 countries. They engaged the vendor valantic for strategic supply chain and procurement consulting to develop a more efficient network and strategy.

valantic conducted a comprehensive analysis and developed optimization scenarios, which included a network concept and a Center of Gravity analysis for ideal hub locations. The solution defined a future-oriented supply chain strategy, enabling PM International to identify potential annual savings in the double-digit million euro range and establish a more efficient and resilient operational structure.