Case Study: Herrenknecht AG achieves greater transparency and delivery reliability with valantic waySuite

A Valantic Case Study

Preview of the Herrenknecht AG Case Study

Herrenknecht AG boosts production planning with Valantic and automates 100 work centers

Herrenknecht AG, the world's leading manufacturer of tunnel boring machines, faced the challenge of coordinating numerous complex projects and global supply chains with a lack of transparency and a need to identify bottlenecks early. To address this, the company partnered with vendor valantic to implement its waySuite advanced planning solution.

The valantic waySuite solution provided an end-to-end system that integrated project, capacity, and production planning, creating a transparent basis for decision-making. This resulted in more stable planning, higher delivery reliability, and increased productivity through automated processes and graphical visualizations. The implementation by valantic gave Herrenknecht a holistic view of its operations, enabling faster, better-informed decisions.


View this case study…

Valantic

269 Case Studies