Case Study: Etihad Rail achieves 100% digital rolling stock maintenance with Valantic and SAP EAM

A Valantic Case Study

Preview of the Etihad Rail Case Study

Etihad Rail achieves 100% digital rolling stock maintenance in 3 months with Valantic

Etihad Rail, the operator of the United Arab Emirates' national railway network, faced challenges in maintaining rolling stock across 264 km of desert under extreme temperatures. Their maintenance processes were not fully digital, hindering efficiency. They partnered with valantic to implement a standardized, integrated asset management system using SAP EAM (Enterprise Asset Management) and SAP Fiori.

valantic delivered a fully digital, mobile maintenance platform integrated via SAP Gateway, eliminating paper and media breaks. Despite a tight three-month timeline and the complexity of standardizing rolling stock data per EN 15380-2, the solution made maintenance more efficient, transparent, and scalable for future network expansion. The results included 100% digital maintenance processes capable of operating in up to 50°C heat, providing a stable foundation for Etihad Rail's growing network.


View this case study…

Valantic

251 Case Studies