Case Study: Cummins boosts customer satisfaction with User Solutions' Resource Manager

A User Solutions Case Study

Preview of the Cummins Case Study

Cummins improves customer satisfaction by scheduling labor months ahead with User Solutions

Cummins Engine, a global power leader, faced a challenge in scheduling labor and machine resources months in advance during a corporate system change. Their existing and new systems lacked the flexible job shop management required for their 33 U.S. locations. They turned to vendor User Solutions and its product, Resource Manager for Excel, to find a stop-gap solution for detailed planning and scheduling.

The solution from User Solutions provided Cummins with a Bill-Of-Resource to schedule tools, labor, and machines, integrating data downloaded from their AS400 system. This allowed them to define load, select realistic customer promise dates, and generate master schedules with excellent visual graphing. As a direct result of implementing this solution, Cummins immediately saw an increase in customer satisfaction.


View this case study…

User Solutions

22 Case Studies