Case Study: a general contractor in Louisiana cuts mud-related downtime with United Rentals Timberlite Mats

A United Rentals Case Study

General Contractor in Louisiana cuts mud-related downtime by 47 days with United Rentals

A general contractor in Louisiana faced severe productivity issues and project delays at a 30,000-square-foot commercial building site due to excessive mud and soggy ground conditions caused by rain. To help stabilize the ground and avoid further delays, the contractor reached out to United Rentals for support.

United Rentals proposed an innovative solution using their Timberlite mats, placing them around the entire site and as an access road. This solution prevented an estimated 47 days of mud-related downtime in the first five months alone, significantly reducing labor costs and keeping the project on schedule. The durable mats also reduced transport costs and eliminated the need for site remediation after rainstorms. The success of the project converted the contractor into a loyal advocate for United Rentals' matting solutions.


View this case study…

United Rentals

19 Case Studies